Automotive Innovation Portfolio

Engineered Components for
Modern Vehicles

High-performance mechanical and electrical systems designed for African conditions and global standards

Mechanical Engineering

Precision Mechanical Components

Robust systems engineered for durability and performance in African conditions

Braking Systems
CAD Render

High-performance disc and drum brakes with 30% better heat dissipation

  • Dust-resistant
  • Low maintenance
  • Extended lifespan
Suspension Systems
CAD Render

Adaptive shock absorbers for African road conditions

  • Self-leveling
  • Corrosion-resistant
  • 5-year warranty
Cooling Systems
CAD Render

High-efficiency radiators with improved thermal dynamics

  • Aluminum construction
  • Compact design
  • 40% better cooling
Transmission Components
CAD Render

Precision-engineered gear systems for smooth power delivery

  • Reduced friction
  • Quieter operation
  • Energy efficient
Electrical Systems

Advanced Electrical Solutions

Smart systems designed for seamless integration with major SKD/CKD models

Lighting Systems
Technical Schematic

Adaptive LED lighting with smart brightness control

Compatible With:

ToyotaNissanHyundai
ECU Modules
Technical Schematic

Engine control units with optimized fuel mapping

Compatible With:

FordVolkswagenKia
Battery Systems
Technical Schematic

High-capacity lithium-ion batteries with thermal management

Compatible With:

All SKD/CKD models
Value Proposition

OEM Integration Benefits

Our locally manufactured components help assembly plants reduce costs and improve efficiency

1

30-45% reduction in import duties

2

Faster time-to-market for new models

3

Local technical support and warranty services

4

Customizable to specific OEM requirements

Import Duty Savings
40%

Average reduction in total landed costs when using IYNEXT components versus fully imported parts

R&D Process

Our Development Pipeline

From initial concept to final product delivery - our rigorous development lifecycle

Concept & Research

Market analysis and technical feasibility studies

4-8 weeks

Design & Prototyping

CAD modeling and functional prototypes

8-12 weeks

Testing & Validation

Rigorous quality and performance testing

6-10 weeks

Production & Delivery

Manufacturing and OEM integration

Ongoing